Others

Method Statement and Installation for Secondary Steel Cages Secondary Steel Cages and Boatlandings are installed after TP less MP is installed.
Because the clearance between the MP and the Secondary Steel Cages are so small, the utmost care is required in the offshore. Safe and secure installation procedures and tools will be proposed.

  • Boat Landing Installtion
  • Boat Landing
  • Hollandse Kust Zuid OWF
  • Boat Landing
  • Gangway -DEME Apollo
  • Cable Laying- STEMAT 82
  • HDD Cable Landfall Hollandse Kust